Kitfox Aircraft Stick and Rudder Stein Air Grove Aircraft TCW Technologies Dynon Avionics AeroLED MGL Avionics Leading Edge Airfoils Desser EarthX Batteries Garmin G3X Touch
Page 3 of 9 FirstFirst 1234567 ... LastLast
Results 21 to 30 of 82

Thread: jf build

  1. #21
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    100_0988.jpg

    finish for that.....we can go for the next job...


    100_0971.jpg

    i install all reinforcement for flaperon bracket....

  2. #22
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    100_0961.jpg

    my fuel gage...


    100_0962.jpg

  3. #23
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    100_0974.jpg

    and for the second time ,i install my two wingtank ...i put one tube of dow corning silicone on each tank and the result was very good....the tank dosen't touch the front and rear spar...thats what i want.....

  4. #24
    Senior Member Dave S's Avatar
    Join Date
    Oct 2008
    Location
    St Paul, MN
    Posts
    1,833

    Default Re: jf build

    JF,

    Not only did the silicon work out well.......from your photo it looks like you had a really good level fit between the top of the tank and the top of the ribs on either side of the tank


    Dave S
    KF7 Trigear
    912ULS WarpDrive

    St Paul, Mn

  5. #25
    Senior Member Esser's Avatar
    Join Date
    Jul 2011
    Location
    Edmonton, AB
    Posts
    2,048

    Default Re: jf build

    Looking good JF. Maybe in a couple years we can meet up at Oshkosh. It's close enough to half way.

  6. #26
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    Thank's Dave...it's only look like on pic,because is a little bit more higher..but it's not bad.......
    And yes Josh...Oshkosh it's more close...

  7. #27
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    hi guy's there is my progress...i install the leading edge..4 hour per piece...
    but good result..the only thing is the overflow of glue each side of LE...some place along the spar are a little bit rought...ans i dont want take chance to sand the aluminum spar...if you are any suggestion let me know...

    Attachment 6035

    100_1032.jpg

  8. #28
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    i let the LE flush with wing tip and 1 inch out to the other side ..

    100_1033.jpg

  9. #29
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    and i starting to install the wing tip attach ...i dont cut the aluminum bar i just trim it..

    .100_1028.jpg

  10. #30
    Senior Member
    Join Date
    Feb 2011
    Location
    Dupuy,Qc
    Posts
    309

    Default Re: jf build

    and install the wood part who hold the sky light...

    [ATTACH]100_1060.jpg[/ATTACH]


    after that my friend Dave give me a hand to remove the wing down ...and i starting to make 4 wing rotator..

    100_1057.jpg

    next i will install the false rib under the fuel tank...
    Attached Images Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •