Made some more progress. Pulled the left wing off and put the right wing on. Fuel tank in, #1 #2 rib installed. Working on the wing tips. A lot more work than originally I thought. Because the wing tips bow when you attach Brandon recommended laying some fiberglass down to stiffen them. Then they did not seem to match up with the LLE very well so I decided to blend them with some superfill and some sanding. Started taking off the fence on second wing so I can install the carbon fence.


Second wing is going faster for both STI's as now we know what to do. We try and think we are each building a plane, instead of us both building 2 planes.....


Should be able to on Monday/Tuesday to finish ribs, fuel cap drain, trailing edge. Then pull wing back of to do the LLE. Much easier to do it vertically off the plane.