I kitfox guy's....i just finish to install the leading edge ( plastic one ) and now i have a doubt about that...my question is for Canadian builder who's working with MD-RA...i do the right thing or not...installing the plastic leading edge before first inspection...??
The entire interior of the wing can still be inspected after the leading edge is installed, even with the bottom fabric in place. The rib to spar application is not very pretty, but structurally sound.