I kitfox guy's....i just finish to install the leading edge ( plastic one ) and now i have a doubt about that...my question is for Canadian builder who's working with MD-RA...i do the right thing or not...installing the plastic leading edge before first inspection...??
The entire interior of the wing can still be inspected after the leading edge is installed, even with the bottom fabric in place. The rib to spar application is not very pretty, but structurally sound.
JF, I don't think an MDRA would give you a hard time since you can see in the inside. I had called and showed the instructions and they told me what they thought but that was just one guys opinion. I wouldn't sweat it. Glad to hear your project is moving