I've searched the forum but haven't found a ready answer. Does anyone know how much cure time is required for the varnish before clamping parts against it? I'd like to get back to installing controls, but the next step is putting in the rudder pedals. I don't want to do that too soon and find that the varnish wasn't cured and is ruined if I have to take the pedal brackets out later.

EDIT: I've been able to keep my garage at ~60-70 deg F for the last several days, so it hasn't been curing in ambient outside temps.