I didn’t order the prefab kit because I have a CNC machine shop. The factory was willing to send the raw materials and plans way ahead of time and I was able to get a head start on the brackets.
Sent from my iPhone using Tapatalk
I didn’t order the prefab kit because I have a CNC machine shop. The factory was willing to send the raw materials and plans way ahead of time and I was able to get a head start on the brackets.
Sent from my iPhone using Tapatalk
Ben Bell
Building 7 super sport
O200 powered