Finally getting after the right wing covering. Just need a 350 degree tightening, MEK bath and then on to rib lacing. Got to talk with John McBean about ordering a prop and some of the parts needed for the control of the constant speed prop and single lever controller. Hope to get that ordered soon. Sounds like it may take a few months to get in.