One of the easy projects, I thought, turned out to be a 3 day 15-hour project to hang the doors. Lots of things have to be done before this can be done. Butt rib close outs needed to be installed, the stainless door opening trim needed to be installed and all the hardware had to be painted before mounting.
They are on and I am glad to check another item off the list.