Butt ribs installed, tanks installed, most tank stand offs bonded in place, jury struts positioned and attach brackets and clamps installed. Half of the wing tip attach strips installed. Other half will go in when we can flip the wings over.
Flapperon rib tail reinforcements installed, trailing edge pieces installed, false ribs partially installed. Flapperon control horns assembled, rigged and installed temporarily, flapperons trailing edges riveted, flapperon brackets prepped and the big event, flapperons installed temporarily. It was a big 3 day weekend at the "Skunk Works". Lots of progress made thanks to Phil keeping me on track and planning my next three tasks. Lots and lots of drilling and swapping of batteries on 3 different drills.
Now four days off for work and I can't wait to get back at it next weekend.
Did I mention how nice those factory quick build wings look?
IMG_1010.jpg
Attachment 8609
IMG_1025.jpg
IMG_1031.jpg
Attachment 8608
IMG_1036.jpg
IMG_1038.jpg
IMG_1041.jpg
IMG_1039.jpg
IMG_1048.jpg